I'm sorry to bring you so much trouble, because 2020 is a very difficult year for us. First of all, the global virus has led to the shutdown of our factory on a large scale. In addition, the material manufacturers we have cooperated with for many years have not survived this disaster, which leads to the closure of the company. As a result, we have to replace the material manufacturers, which will give us JTK CA set production (JTK vostok).There are many unknown problems and troubles.
With regard to HSA, the problem we are facing is more complicated. At the end of 2019, the old engineer in charge of the HSA project resigned and left. In addition, due to the long-term vacancy caused by the epidemic situation, we did not have any engineers to take over in time. Although we searched for the latest engineers after the resumption of work, because of the high complexity of the project, we conducted the following tests At present, HSA is still in the modification and testing stage.
As compensation (although we know that this compensation can not make up for the customer's waiting loss, but we can only rely on such measures to comfort customers at present), each set of HSA orders will receive the following products:
1,JTK HSA CMYW set
2, JTK CA novelties set(As a conservative plan, we dont want do HSA novetlies so far)
The implementation and distribution of the compensation plan will be communicated and discussed with the vendors to determine that after all the projects are completed, the compensation will be distributed to each customer