Sandblast : Beginning September 13th ~ Completed on September 20th
Anodizing : Beginning September 21st ~ Completed on September 27th (Approximately one week expected.)
Cerakote : September 21st~
QC : 2 Days
Packaging and Sequential Shipment Complete : By October 5
First of all, I apologize for the late delivery schedule.
After we shipped the spring, we tried to find a suitable carrier.
In the case of EMS, there was a lot of loss and return, and we found a shipping agent to replace it.
However, there was a problem with the length of the delivery period and the problem with the delivery agency in Korea.
In the end, we aimed to deliver it safely, even if it took longer.
Initially, only 30 units were going to be sold on the marketplace. (silver, black, red color)
However, due to the large number of requests, we increased the production quantity, and although the period was sufficient at first, the processing and post-processing schedule was delayed due to problems with the delivery company and covid-19.
Currently, we have received the above schedule from the company, and although it was difficult because it was our first time to control a large quantity, we think it will be completed within the schedule written above.
We will do our best to repay you with good quality products.