geekhack Marketplace > Group Buys and Preorders

[GB] Calla - F13 TKL w/ reduced switch spacing [Shipping]

(1/4) > >>

kevinave:
Current Update

Last Bi-Weekly Update 04/27/2024:

Github Link: here

Update Sheet Link: here

Update Notes:

Expected to start shipping out this week, with extras releasing two weeks after the last unit ships out. Divinikey's team did an excellent job QC'ing :)

I'll make one more update before extras come out, but other than that we've finally made it. Thank you for your patience and I can't believe that it's nearly finished.

Discord server will be maintained for the foreseeable future as a direct line of communication to me for technical questions and support.



Previous Updates
MoreUpdate 04/13/2024: Calla should arrive at the warehouse by the next update!

Update Sheet Link: here

Update Notes:

Hopefully I didn't jinx it but it is slated to arrive within the next update window. Foam has arrived and is being kept at DK's warehouse.




Update 03/30/2024: Cases still in Transit!

Update Sheet Link: here

Update Notes:

Looking forward to getting them :]





Update 03/16/2024: Cases in Transit!

Update Sheet Link: here

Update Notes:

Carrying cases finished, cases are currently being packed and shipped to us. Once they arrive, its only a matter of QC'ing the units before fulfilling GB orders.





Update 03/02/2024: Carrying Cases nearly finished

Update Sheet Link: here

Update Notes:

Carrying cases are projected to be finished by the 10th. If there are further delays, we are looking into having the Calla units shipped over to hasten QC.




Update 02/17/2024: Production Resuming Shortly

Update Sheet Link: here

Update Notes:

Production resuming shortly after holidays. I intend to track carrying case progress closely.




Update 02/03/2024: CNY begins for factories

Update Sheet Link: here

Update Notes:

Nothing much to say besides holiday has begun so production on the carrying cases are on pause.




Update 01/20/2024: 5th Monthstone

Update Sheet Link: here

Update Notes:


Carrying Case: Latest ETA from manufacturer is March 2024
Foam: Shipped out within the month or shortly after CNY
O-rings: Shipped from manufacturer
Electrocapacitive PCBs: Updated firmware to reenable VIA compatibility and allow for calibration and actuation point setting. More testing is still required.

This update marks the 5th month since the GB had ended. As it stands, it looks like everything besides the carrying cases and items dependent on the carrying cases will arrive within a month from now.

I had not expected carrying cases to take this long to finish production. Luckily, if there are no additional delays with the carrying cases, we can still make it within the original GB estimate of 6-8 month lead time, albeit in the far latter portion of the estimate.

In the meantime, I will continue to work on validating the open sourced files and will begin to release them as they are finished within the coming weeks.





Update 01/06/2024: First update of the year!

Update Sheet Link: here

Update Notes:

PCBs: Arrived at warehouse, starting QC. Will be working on adding calibration to EC firmware this week.
Foam: Apologies about the foam status, the order seems to have been delayed for longer than I would have hoped. Trying to get production started by next update.
O-rings: Should be in transit by next update.
Carrying Cases:  Reaching out again this week to see if I can get an updated expected completion date.



Previous Updates


Update 12/23/2023: Happy Holidays and an Early New Years!

Update Sheet Link: here

Update Notes:
PCBs: Arrived at customs
all CNC parts:  Finished, now waiting for carrying cases to be finished for shipping purposes

* I moved all cnc'd parts to 'transit' status to denote that they've finished production but they will not be shipping to our warehouse until they can be safely packed into the carrying cases (which requires the carrying cases to be finished as well)



Update 12/09/2023:

Update Sheet Link: here

Update Notes:
PCBs: Still in transit to warehouse
CNC:
    Case: Anodization 90% complete
    Weights: Finished CNC, waiting for engraving




Update 11/25/2023:

Update Sheet Link: here

Update Notes:
PCBs: In transit to warehouse
CNC:
    Case: CNC Finished
    Weights: In CNC




Update 11/11/2023:

Update Sheet Link: here

Update Notes:
PCBs: Boards have been cut, moving onto assembly + flashing
CNC: Nothing new to report, will ask for a more detailed update for the next update





Update 10/28/2023:

Update Sheet Link: here

Update Notes:
Orings/Foam: Just to explain, the turnaround time should be incredibly so I'm waiting to order them when the cases are ready to be shipped.
PCBs: Production samples confirmed. Everything okay, found and fixed a few firmware bugs. Factory should begin production run of all PCBs from now on.
CNC: Currently machining GB units


Update 10/14/2023:

Update Sheet Link: here

Update Notes:
This update marks our 2nd month of updates.
PCBs: Production samples arrived in the States and are in transit directly to me. These are the final production samples and after I've confirmed their status, the factory will begin full production of the PCBs.
CNC: Programming is nearly finished. After it's finished CNC of the units will begin




Update 09/30/2023:

Update Sheet Link: here

Update Notes:
Production Sample PCBs are in transit


Update 09/16/2023:

Update Sheet Link: here

Update Notes:
Carrying Case photos soon(?) Fixed some date issues with the chart as well




Update 09/02/2023:

Update Sheet Link: here

Update Notes:
Nothing out of the ordinary besides a hurricane in California.




Update 08/19/2023: First post-GB update

Update Sheet Link: here

Update Notes:
Color distribution chart and numbers posted. Does not include extras from DK.






GB Information
More
Calla





Directory:

* Divinikey's Calla Group Buy page
* Discord server
* Pre-GB Feedback Form Closed!
* geekhack IC Thread
* Full V3 Prototype album
* V3 Prototype Sound Test
Group buy details:

* GB window opens on July 17th 11 AM Pacific
* GB ends on August 14th 11 PM Pacific
* Estimated ETA is around Q1 2024 (6-8 month lead time)
* Vendor: Divinikey
* Kit Options: Solder Hybrid-MX, Hotswap MX, or EC Topre
* Format: FCFS through Divinikey's storefront
* Hard limit: 150 kits
* Solder MX Kit Cost: $450
* Hotswap MX Kit Cost: $455
* EC Topre Kit* Cost: $480
*If you are interested in purchasing a Topre kit or Topre extras, please consult the build guide first

As for the group buy format, there will be a product page listed on Divinikey's storefront in which you will be able to customize your kit, order extras, and pay for your order. Furthermore, order fulfillment will be handled through Divinikey, for more information regarding their shipping policies, see here.


Kitting Information:

* Top and Bottom Case
* Exterior weight
* Interior weight
* Mounting Plate (Full MX Aluminum/Polypropylene or Full Topre StS* based on selected kit)
* PCB (Solder, Hotswap, or Electrocapacitive depending on selected kit)
* Carrying Case
* Hardware Kit
* 8 x M3 6mm 18-8 StS Socket Head Case screws (91292A111)
* 4 x M3 4mm 18-8 StS Hex Drive Flat Head Weight Screws (92125A127)
* 7 x M2.5 5mm 18-8 StS Socket Head Plate Screws (91292A009)
* 4 x M2 3mm Zinc-plated Daughterboard Screws (91460A021)
* 1 x Gummy O-ring (50A)
* 4 x Bumpons (SJ5302)
* 1 x 100 mm JST connector
* 1 x Universal Daughterboard
*StS plate comes with appropriate mounting screws (91200A104) for Topre builds





Compatible Configurations:
More


*The Electrocapacitive PCB supports split backspace, split right shift, and stepped caps-lock. However, the plate offered in the group-buy only supports the depicted configuration.


Miscellaneous Information:

* Layout: F13 WKL TKL
* Switch Spacing: 18.9 mm
* MX Mounting: Top mount or gummy O-ring gasket mount
* EC Mounting: Top mount only
* Typing Angle: 5.5 degrees
* Height: 21.9 mm effective keyboard height / 17.9 mm front face height (w/o bumpers)
* Weight: ~4.0 lbs/1810 grams built
* Top engraving: Calla lily

* PCB Firmware: QMK w/ VIAL enabled
* PCB Thickness: 1.6 mm
* PCB Material: FR4
* Connector: USB Type-C
* Daughterboard: Universal Daughterboard

* Case Material: 6063 Aluminum
* Internal Weight Material: Brass
* External Weight Material: Stainless Steel
* MX Kit Plate Material: 5052 Aluminum or Polypropylene
* EC Kit Plate Material: Stainless Steel

Extras:

* Solder MX/Alp Hybrid PCB (+$35)
* Hotswap MX PCB (+$40)
* Electrocapacitive PCB (+$50)
* Aluminum MX Full Plate (+$40)
* Polypropylene MX Full Plate (+$40)
* Stainless Steel Topre Full Plate (+$55)
* Hardware Kit + PE PCB Foam* (+$20)
*There will be different durometer O-rings to select as part of the hardware kit. The hardware kit that comes with each board will have a 50A durometer ring by default.





Build Stream:
A silver unit is going to be built by TaehaTypes on his Twitch at July 12th 1PM Pacific! The planned build is Cherry MX Blacks on a polypropylene plate so come through if you are interested!

Build stream has been finished! Full vod is available here

Below are some clips I've made of relevant events:
   
Gateron Ink Blacks + Alu Plate:
* O-ring/Top Mount
* O-ring only
* Top Mount only
Cherry MX Blacks + PP Plate
* O-ring/Top Mount
* O-ring only
* Top Mount only
Misc:
* Taenut

Pre-GB Interest Check Form:

Due to the length of time between original interest check and now, I wanted to collect some last minute feedback on the planned group-buy format and structure as well as guage the current interest in the project. Furthermore, with recent events in group-buy fulfillment, I do not want to start a group-buy without confidence that MOQ can be met without vendor help. The form also has the option to "reserve" a group-buy kit, which will send you an invoice that will be active through the entirety of the first day of the group-buy. The form will be open until July 14th, 2 PM Pacific.


Estimated Fulfillment Timeline:

* Group buy (ongoing): here!
* Processing orders (1 week):
* Ordering from manufacturers (1 week):
* Waiting for production (6 months):
* Receiving inventory (1 month):
* Packing and quality control (2 weeks):
* Delivery (2 weeks):
All in all, we're aiming for a turnaround time of around 6-8 months (mid-late Q1 2023). Of course, delays are inevitable but I will do my best to maintain a clear line of communication throughout the fulfillment process.


Update Process:

After the group buy window ends, there will be bi-weekly updates on both discord and this Geekhack thread outlining the fulfillment progress. I plan on having separate timelines for each part, so that it will be easier to visualize the fulfillment process at each stage. Even if there was no change since the last update, I will still relay that information in a new update post.





Open Source Parts:

Everything except for the case files will be open-sourced following Group Buy completion. This includes plate files, firmware, PCB files, weight files, and anything else that could be helpful. If there are any modifications you would like made to an existing file, (such as making a split backspace and split right shift Topre plate) feel free to reach out to me and I would love to help.


Compiled Q&A Section:
MoreQuestion: What stabilizers are compatible with the StS Topre plate?
Answer: Compatible with both Costar and Cherry plate mount. Still attempting to source compatible plate mount wires from deskeys but have not heard much from them.

Question: Has there been any interference issues with any keycaps/profiles?
Answer: So far, I have found no interferences with any keycaps I have tested. Some profiles like MT3 are harder to remove with a keycap puller but was still manageable by removing the assembly from the case before attempting to remove keycaps. I have a more extensive writeup on the second message of the IC thread.


Afterword:

Despite the challenges in finding a suitable manufacturer, I was able to use the additional time to further improve Calla. Most notably were the development of a new electrocapacitive PCB for Calla (made possible with the open-source projects of Cipulot and the sanity checking by Langer), a lower $450 base price, and collaborating with the exceptional crew at Divinikey, who will serve as the vendor for the group buy. It was an absolute journey to get here and I just want to say: thank you for your support, take care, and have a wonderful day.

soloplayer:
Calla so 🔥

phaxin:
In for a mx kit with topre extras  :thumb:

Patty:
damn the taenut is selling me, beautiful board and it sounds awesome, good luck with the gb!

LightningXI:
Any plans for an F12 top design? :think:

Navigation

[0] Message Index

[#] Next page

Go to full version