In the Round 1, The failure of PCB MOQs resulted in Manual soldering, I waited and tried to gather more orders till mid January.
and The Inspection and Reproductions for some parts took a long long time. I am so sad. Apology!!!
I will try my best to ship out the remaining R1 orders, as soon as possible!!!
In the Round 2, I will try to gather enough for the MOQs, if Not, I will drop it or try to fill it. This may boost the whole speed.
The Process of Inspecting and Sorting Parts and Springs are much improved during R1, I guess it will be much faster (max. 1 months)
The Small parts are already organized to be ready for Round 2.
Thanks Guys for this Happen! It was my dream to have things like this.