Status - July 18th
Round 1 : Shipping on going (~ 37 persons left to ship)- Most of Small parts orders are already shipped out.
- Doing diode soldering before shipping Now. http://geekhack.org/index.php?topic=50580.msg1405742#msg1405742 - Sending a Personal message before each shipping to Reconfirm the details! - Finish the Shipping : by August 8th (11th) - So Sorry for the Delay !! I'm a sinner. Round 2 : Start Invoicing 80% Done! - (Proxy Shipping will be prepared) - PCB : 60% hit the MOQ (all SMD presoldered) -
Start Invoicing. - PCB : 75% (20pcs needed for the MOQ), 87%
(20pcs needed for the MOQ), 110%
(40pcs needed for the MOQ) * IF the MOQ fails, The main controller Parts will be presoldered, then You may need to solder the diodes, LED resistors (It's very time consuming but Not that difficult and some fun)
- Metal Plates, Metal Cases : Far below the MOQ, Failed.
- Acrylic Plates, Cases : hit the MOQ, Start Invoicing.
- The other Parts : hit the MOQ,
Start Invoicing. Spring GB R2 90%Invoiced.- The Proxy shipping to Save cost will be prepared for the PCB and small Parts. - Order by ~21th (26th)
- Start Parts supply &
Production : from July 21th ~
- Start Inspection & Packiing : from August 11th ~
- Start Shipping : From August 15th ~
- Finish Shipping : by Sep. 15th