1
Interest Checks / Re: [IC] Ursus - Symmetrical wkl 65%
« Last post by Rob27shred on Tue, 15 July 2025, 15:08:59 »Bumping the thread.
Small update:
The manufacturer is currently very busy, and estimated 1-2 months before I'll have the prototype (that being in late June when I ordered it).
To put into context, that is not how long it actually takes to manufacture it, but for a very small unit count, or single unit like in this scenario, it will be put in a queue behind all of the larger quantity orders.
The bottom anodizing color, which should be the trickiest to get right (as opposed to the silver top), has been finalized.
Here's a video of the anodized color:
The MX PCB design is almost done and I will be ordering one very soon, as for the EC PCB it will be a little while longer.
Look forward to a larger update when I Receive the MX PCB and Prototype.
The anno sample looks awesome! Hopefully they can keep that quality up with the actual bottoms! Yeah I'd imagine it's one of the busier times of the year for the manus, 1- 2 months isn't the worst wait though. Also looking forward to see the PCB designs when you get those together. Anyways still loving this project, I'll definitely be having as many people I can at out next local Pittsburgh meetup take a look at it! Great work on this so far, hope iy keeps going smoothly for you!
