Hey guys, small update:
PCB orders are actually being held for *a tiny bit* longer. Sorry, but current ETA will either be late this week or after Christmas, into January. Had a discussion with PCB designer and we have agreed to upgrade a few capacitors to another variant. Won't go into specifics, but it needed to be done. Future Zeal60 revisions will incorporate the new capacitors.
Orders with stabilizers: We thought it would be best to screw-in the screws into the stabilizer ahead of time, making it simpler to pack. Unfortunately as we went through 2 large freezer ziplock bags worth, and at the bottom of the bag there were 34 screws that came undone (of ~3000+ screws we had inserted). What we're doing to mitigate this issue: screw in the screws fully into the housing instead of half way in. Roughly 50 boxes that have already been packed today may be affected by this issue. To solve the issue, we're giving 4x extra screws for each box that was packed over the weekend and that'll receive a shipping notification today. It'll either be taped on the exterior side of the box (only a few DHL boxes printed before this post), or we have cut a slit into the tape to fit the screws in within a small zip bag.
A few orders went out last week may also be affected. If you are missing a screw, send me an email with a pic and your order # and I'll have a few screws sent out via bubble mailer. Sorry about the inconvenience. It shouldn't affect more than 34 customers.
Other than that, we are still working hard to pack everyone's order out. Baggies have been packed up to 52xx, but due to the way we bulk pack, sometimes a few order numbers a bit higher do go out a bit earlier. Shouldn't delay much more than 1 day as we try to move orders in the +-200 range a day. Hope that makes sense.