Sorry peeps. Not much of a GH-er. I have received the sets, confirmed that we were shipped the correct number of every kit and have packed about half of them as of tonight. I am going to grind it out tomorrow and Friday and try to get them all done to try to have them shipped out Friday. These take a bit longer to pack than GMK, as you can image with 18ish kits to sort through. Remember that we do have about 1300 of the 2000+ kits that were ordered, so we are going to take a bit longer to finish than the other proxies, who have much smaller numbers. But we are heavily into it and are working hard to get it all out to everyone.
Also, the missing blank 2u cap has been added to all the ErgoDox kits so they have all been fixed.