What's your turn around time?
It was pretty bad on all my recent orders I won't lie, months. However I took on more orders than I should have at once, and was delayed on some parts arriving, then school and real life, and the holidays made everything get wonky.
However now I'm only going to take two jobs at a time and hope to turn them around in one week, or two max. Easier jobs will be faster of course, say just stem/spring/lube some switches as compared to stem/spring/sticker/lube switches to solder to a PCB with SMD diodes surface mount resistors and LEDs. I am not fast, but I am thorough and try to do a really good job. To me building keyboards and tuning is therapeutic like building LEGO.