Does anyone have a rough estimate on how long it would take to receive a NerD 60 PCB, acrylic case, plus diodes, stabilizers, etc?
Already tried contacting GON; Still impossible to get ahold of, so I'm hoping someone here can help. If there's still a huge delay, I'd like to know so I can just wait until he's not swamped or something.
Also, can anyone tell me the resister value I would need for
these LEDs? I'd be using those for both the side LEDs and the switch LEDs.
Oh and last question: Does anyone happen to have a photo of that acrylic case (doesn't have to be 60%, I just want to get an idea) with every layer as clear? I've looked around and can't find anything, but it would be nice to get more of an idea what I'd be getting.