The GB will be open until April 30th or until we hit 150 units (whichever comes last). If this number is looking unrealistic after 2 weeks we will re-evaluate what we are able to do.
Usually the phrase is "whichever comes first" so I agree that this is a bit confusing. The only thing that is clear is that MOQ is 150
Right. Although I think it's something along the lines of:
> The GB will have an MOQ of 150 and will run until April 30. However, it may continue after that if the MOQ hasn't been reached at that point.
> On the other hand, if the number of sold units looks unrealistic (too little, or too much) two weeks after the GB opens, then we will re-evaluate what we are able to do.
Maybe Max can use that instead in the OT.