Round 1 : Shipping on going (~ 37 persons left to ship)- Doing diode soldering before shipping. - Sending a Personal message before each shipping - Finish the Shipping : by August 8th (11th)- So Sorry for the Delay !! I'm a sinner.
Round 2 : Start Invoicing 75% Done! - (Proxy Shipping will be prepared)
- PCB : 60% hit the MOQ (all SMD presoldered) -
Start Invoicing. - PCB : 75% (20pcs needed for the MOQ), 87%
(20pcs needed for the MOQ), 110%
(40pcs needed for the MOQ) * IF the MOQ fails, The main controller Parts will be presoldered, then You may need to solder the diodes, LED resistors (It's very time consuming but Not that difficult and some fun)
- Metal Plates, Metal Cases : Far below the MOQ, Failed.
- Acrylic Plates, Cases : hit the MOQ, Start Invoicing.
- The other Parts : hit the MOQ,
Start Invoicing. - The Proxy shipping to Save cost will be prepared for the PCB and small Parts
Start Production : from July 21th ~
Start Inspection & Packiing : From August 11th ~ (with all parts, springs etc)
Start Shipping : From August 15th ~
Finish Shipping : by Sep. 13th