Hope ya'll are doing well. 3 Month Update Since GB End:
CasesCovid Complications happened there and they may not finish till after CNY which will add a lot in terms of delays, but we'll still be on track for the 6 month timeline.
I received photos for production color samples last night, Lilac came out too metallic and Gunmetal too black and matte. Will be having them redo the lilac and having them match the gunmetal to my proto better.
PCBsProduced with pictures below. Fab needs to flip LEDs which will delay a few days(which thanks to the case manu doesn't change anything) then they'll ship to the case manu. Pics below:
MiscHS Screw Kits were sent to the case manu and received.
Everything outside of Cases & PCBs are in stock and will be ordered upon arrival of pallets from China.