Bumping the thread.
Small update:
The manufacturer is currently very busy, and estimated 1-2 months before I'll have the prototype (that being in late June when I ordered it).
To put into context, that is not how long it actually takes to manufacture it, but for a very small unit count, or single unit like in this scenario, it will be put in a queue behind all of the larger quantity orders.
The bottom anodizing color, which should be the trickiest to get right (as opposed to the silver top), has been finalized.
Here's a video of the anodized color:
The MX PCB design is almost done and I will be ordering one very soon, as for the EC PCB it will be a little while longer.
Look forward to a larger update when I Receive the MX PCB and Prototype.