Just caught wind of the thing with the switches and 7bit.
Let me make sure I got this straight. I can either go to DT and preorder from 7bit, indicating that I want my stuff shipped to the GH60 group buy staff, for around 40€ ($52) for 65 switches. In this case I'm basically paying 7bit instead of you guys for the switches, and nothing else changes.
OR
Do nothing, sit on my buttocks, and you guys order the keys from 7bit after payment is collected next month, which could incur in severe shipping delays of the assembled board, perhaps several months.
Correct?
I'm not 100% sure I can find enough money before the order deadline to pay for switches. Getting into this GB required extensive budget fiddling with the goal of having enough money around the 10th of next month. Unfortunately, it ended up meaning I have little to no spare cash at all before that. I won't bore you with my financial details.
Worst case, I'll have to wait however long it takes for you guys to order and receive the switches after next month's payment is down. Best case, we (the GH60 staff and me) could somehow reach an agreement involving me ordering the switches from 7bit between now and at some point next month, depending on my cash flow, and have them delivered to you.
What would you prefer I do? I'd also like to take as much work off your hands as I can. Organizing this must be administrative hell.