-----------------------------------Just a quick and dirty picture after a long night of modding:----------------------------------------------------------------------Info:-----------------------------------Switches: Modded Browns
Mods: Stainless Steel Plate, Red Stickers, Costar Stabilizers, Custom 62g springs, Lubed with SuperLube (springs, sliders and stem)
-----------------------------------Some time stats:-----------------------------------Adding Switches to plate: 20 minutes
Removing switch tops: 15 minutes
Stickering: 30 minutes
Lubing: 1 hour 15 minutes
Installing stabilizers, plate onto PCB + checking stabilizers: 25 minutes
Total Time: 2 hour 45 minutes
Took a lot less time than the other poker, but I think I just learned to sticker and lube a bit faster