Update - Oct 8- Manufacturer has shipped ~90% of boards to me (should be here hopefully this week or next week - pending import/customs/etc)
- Some remaining units require PVD re-finishing of the internal weight.
- AN-C PCBs had stabilizer 6.25U cut out issues (replacements have been ordered. See below)
What's next?:- Units will undergo QC.
- Take this time to check your order and shipping address. (Reply to your ORDER CONFIRMATION email for verification and record keeping).
- We are not ahead of schedule just yet. If you receive a tracking number notification, this means your order is being prepared (please give us time to put together, pack, and ship your order. When your packaged is SCANNED by the carrier, it will indicate that your order is now on the way to you.)
Please reply to your
confirmation email if:
- You ordered a WKL/HHKB top AND need a pcb that works with 6.25U spacebar.
- You ordered a Standard top order and do NOT need 6.25u, I can ship your order with the b-stock pcb. Otherwise, you will have to wait for the correct pcb (which are in production). A refund of $10 will be applied before your order is shipped.
Typing tests, prototype pictures:
More