-----------------------------------Just a quick and dirty picture after a long night of modding:----------------------------------------------------------------------Info:-----------------------------------Switches: Modded Clears
Mods: Stainless Steel Plate, Pink Stickers, Lubed with SuperLube (springs, sliders and stem)
Other: PCB Mount Cherry Stabilizers
-----------------------------------Some time stats:-----------------------------------Adding Switches to plate: 20 minutes
Removing switch tops: 15 minutes
Stickering: 45 minutes
Lubing: 1 hour 45 minutes
Installing stabilizers + plate w/ switches: 30 minutes
Total Time: 3 hours 35 minutes
I guessed about 4 hours, so I wasn't too far off. Now it just needs to be soldered, stuck in a case and shipped to hellocodes