Author Topic: How I store my keyboards: the banana method  (Read 16757 times)

0 Members and 1 Guest are viewing this topic.

Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
How I store my keyboards: the banana method
« on: Sun, 05 June 2016, 20:00:14 »
I was looking for a way to store my keyboards that'd work vertically and open, for everyday access; and horizontal and closed, for storing them away.

Cardboard boxes seemed like a logical (and free) solution. But regular single-walled boxes aren't strong enough to hold a bunch of heavy keyboards upright, or to stack one box of them on another.

Two words: banana boxes.

Unlike most corrugated boxes, banana boxes are double-walled:





...so they're twice as strong (I did the math). And they're a great size for keyboards, up to large 101-key boards like Model M's. To store your keyboards vertically and open, you can use the bottom of one as-is:


139005-1


Whether you bubble-wrap them or not is up to you. I've wrapped mine completely (using small pieces of transparent packing tape) for the 2nd part of this article. For regular access like this, you can make each board a bubble-wrap "pocket" by wrapping all but one long side of it, so you can easily slip it in and out of its wrap.

Using these boxes for horizontal, stacked storage is a bit trickier.

I'm sure there's a good reason, but banana boxes have a rectangular hole in their top and bottom:


139007-2


139009-3


The advantage is, most people don't want boxes with holes like this, so they're easy to get. I don't worry about the top hole, either, as I don't find it affects the box's integrity.

But that bottom hole? You may think the box is strong enough even with it. That could depend on the size and weight of the boards you're storing. I can't make that choice for you—but what I can do is show you how I cover the hole and reinforce the bottom.

If these descriptions and photos seem like overkill, I'm posting them for the benefit of our less-handy members (you know who you are!). I also live in the suburbs, so this qualifies as excitement.  :?|

1. Place a newspaper section under the box bottom to protect the surface you're working on:


139011-4


2. Measure the area of the box where it looks like some cardboard is missing; then cut a piece that size from a regular single-walled box:


139013-5


3. Squirt some yellow carpenter's wood glue on the box's two exposed surfaces, then use a Popsicle stick to spread the glue evenly. Don't use too much glue, only as much as you need to spread it to the edges of the areas:


139015-6


139017-7


Carpenter's glue is stronger than white glue—and much better for woodworking projects, too—so it's worth picking some up. You can usually get it at dollar stores. They also sell Popsicle sticks there, which they call "craft sticks".

4. Place your cardboard piece over the glued area:


139019-8


...and cover it with a piece of aluminum foil at least 1" bigger than the cardboard piece on all sides:


139021-9


5. Now place two piles of books over the glued areas. The foil should protect them from the glue—but don't use any books you really care about, especially on the bottoms:


139023-10


Minimum drying time is 30 minutes, but for the strongest bond I let it dry overnight.


139025-11


You now have a box strong enough to stack another box of keyboards on top of it. Don't stack them more than two high.
« Last Edit: Sun, 05 June 2016, 20:02:48 by ander »

Offline 1swt2gs

  • Posts: 621
  • Location: CA
  • DOGE
Re: How I store my keyboards: the banana method
« Reply #1 on: Sun, 05 June 2016, 20:03:19 »
Very innovative and well thought out even including a DIY!

:D
Such artisan, many caps, very keyboard.

Always searching for Bro caps! 

1swt2gs classifieds!


Offline nmur

  • ಠ_ಠ
  • Posts: 1544
  • Location: Sydney
Re: How I store my keyboards: the banana method
« Reply #2 on: Sun, 05 June 2016, 20:04:47 »
will this work if i use a pineapple box instead of a banana box?

Offline fohat.digs

  • * Elevated Elder
  • Posts: 6567
  • Location: 35°55'N, 83°53'W
  • weird funny old guy
Re: How I store my keyboards: the banana method
« Reply #3 on: Sun, 05 June 2016, 20:07:18 »
Fruit boxes need holes for air circulation so that the fruit can breathe.

Why not just cut the bottom and top filler panels the full size of the box?
“These economic royalists complain that we seek to overthrow the institutions of America. What they really complain of is that we seek to take away their power."
He paused for a moment, then thundered, “Our allegiance to American institutions requires the overthrow of this kind of power!”
“In vain,” Roosevelt said, “they seek to hide behind the Flag and the Constitution. In their blindness they forget what the Flag and the Constitution stand for. Now, as always, they stand for democracy, not tyranny; for freedom, not subjection; and against a dictatorship by mob rule and the over-privileged alike.”
- Franklin Roosevelt 1933

Offline zcmy

  • Posts: 71
  • Location: True North.
  • I really should be working... not "working"
Re: How I store my keyboards: the banana method
« Reply #4 on: Sun, 05 June 2016, 20:14:08 »
Fruit boxes need holes for air circulation so that the fruit can breathe.
Fruits have lungs?

Why not just cut the bottom and top filler panels the full size of the box?

Might be easier. However, I'm not OP so I can't say for sure.

Offline Bucake

  • Posts: 945
  • Location: The Netherlands
Re: How I store my keyboards: the banana method
« Reply #5 on: Sun, 05 June 2016, 20:14:51 »
next gen keyboard storage

Doctors hate him!
IBM Model F XT // Realforce 87U 55g Type-S // HHKBP2 45g Type-S // KBT Pure Pro Cherry MX Red

Offline 1391406

  • Posts: 1192
  • Posts: 24838
Re: How I store my keyboards: the banana method
« Reply #6 on: Mon, 06 June 2016, 09:05:22 »
Fruit boxes need holes for air circulation so that the fruit can breathe.
Fruits have lungs?

What, you've never heard of (or eaten) banana lungs? I'm not sure where you're from but in the United States the Produce Cruelty Act (Prop 1) was enacted in 1997 which basically considers it a Class A misdemeanor to subject any produce (including bananas) to cruel mistreatment (including injury or death) prior to sale for consumption. Thus, it's currently illegal for supermarkets to store bananas in any container that's not well-ventilated.

« Last Edit: Mon, 06 June 2016, 09:07:02 by 1391406 »
Unicomp Classic | Chicony KB-5181 (Monterey Blues) | IBM Model M (1391401) | IBM XT Model F | IBM AT Model F | Dell AT101W | 122-key IBM Model F
IBM Model M13 | Apple Extended Keyboard | Apple Extended Keyboard II | MTEK K104 | NTC KB-6251/2 | Realforce 87U | Realforce 104U | Type Heaven

Offline zcmy

  • Posts: 71
  • Location: True North.
  • I really should be working... not "working"
Re: How I store my keyboards: the banana method
« Reply #7 on: Mon, 06 June 2016, 23:40:06 »
Fruit boxes need holes for air circulation so that the fruit can breathe.
Fruits have lungs?

What, you've never heard of (or eaten) banana lungs? I'm not sure where you're from but in the United States the Produce Cruelty Act (Prop 1) was enacted in 1997 which basically considers it a Class A misdemeanor to subject any produce (including bananas) to cruel mistreatment (including injury or death) prior to sale for consumption. Thus, it's currently illegal for supermarkets to store bananas in any container that's not well-ventilated.

Whoa. Whoa, here, Banaas don't have rights. We ship them with air holes...or bullet holes, now that I think about it.

Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
Re: How I store my keyboards: the banana method
« Reply #8 on: Tue, 07 June 2016, 02:32:30 »
will this work if i use a pineapple box instead of a banana box?

Don't think so, unless the KBs you're packing aren't higher than pineapples are thick:



Of course you may just be pulling my modem cable by asking. I don't mind; I love fruit-box-related questions.


Fruit boxes need holes for air circulation so that the fruit can breathe.

That'd be my guess too, but further investigation seemed beyond the scope of this topic.

Why not just cut the bottom and top filler panels the full size of the box?
  • The outer 3rds would end up triple-walled, which is overkill.
  • It'd require that much more glue, that much more spreading time, that much more foil, and that many more books.
  • I doubt you'd find the right sizes of books to cover such a specific area; you'd need to cut a piece of plywood that size to put books on.
I don't know what you'd be putting in there (bowling balls?), but simply filling in the middle 1/3 makes a box plenty strong enough to carry around 8 Model M's, and stack another one on it. This seems sufficient.

Speaking of carrying stuff, I forgot to mention another nice thing about BBs. Unlike most supermarket boxes, they have handles:




Offline Wazazaby

  • Posts: 152
Re: How I store my keyboards: the banana method
« Reply #9 on: Tue, 07 June 2016, 04:14:27 »
Funny way to store your boards!!

Offline chyros

  • a.k.a. Thomas
  • * Esteemed Elder
  • Posts: 3515
  • Location: The Netherlands
  • Hello and welcome.
Re: How I store my keyboards: the banana method
« Reply #10 on: Tue, 07 June 2016, 05:55:27 »
I moved all my stuff to the UK using banana boxes. I can't find them around here anymore though, which is a shame.
Check my keyboard video reviews:


Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
Re: How I store my keyboards: the banana method
« Reply #11 on: Thu, 09 June 2016, 23:47:05 »
Funny way to store your boards!!

It works, and it's (almost) free! Plus it's fruit-related, which always reminds me of the fruit you got as power-ups in classic video games like Pac-Man, which seems like a good connection to keyboards, theme-wise.

I moved all my stuff to the UK using banana boxes. I can't find them around here anymore though, which is a shame.

Perhaps they just pronounce "banana" differently. People in the UK often use English words, as we do, but for some reason they emphasize different syllables. Try visiting a produce merchant and asking if they have "BA-nana" or "bana-NA" boxes. Let us know if this helps. If it doesn't, stopping in at the nearest pub for a pint is a good fall-back plan, as long as you're careful to sit in a booth and not on a bar stool.

Offline chyros

  • a.k.a. Thomas
  • * Esteemed Elder
  • Posts: 3515
  • Location: The Netherlands
  • Hello and welcome.
Re: How I store my keyboards: the banana method
« Reply #12 on: Fri, 10 June 2016, 02:32:32 »
It's pronounced "ba-NAH-na" here. Back home you can collect them for free from big bins at the entrance of supermarkets, but Sainsbury's don't appear to be so generous. Maybe if I ask them.

I presume in Canada they say either "ba-NEH-na" like your Southern neighbours, right? Or maybe "banana-eh"? :P
Check my keyboard video reviews:


Offline fohat.digs

  • * Elevated Elder
  • Posts: 6567
  • Location: 35°55'N, 83°53'W
  • weird funny old guy
Re: How I store my keyboards: the banana method
« Reply #13 on: Fri, 10 June 2016, 06:56:43 »
It's pronounced "ba-NAH-na" here. Back home you can collect them for free from big bins at the entrance of supermarkets, but Sainsbury's don't appear to be so generous. Maybe if I ask them.

I presume in Canada they say either "ba-NEH-na" like your Southern neighbours, right? Or maybe "banana-eh"? :P

In the US it is pretty much always "ba-NAN-uh"
“These economic royalists complain that we seek to overthrow the institutions of America. What they really complain of is that we seek to take away their power."
He paused for a moment, then thundered, “Our allegiance to American institutions requires the overthrow of this kind of power!”
“In vain,” Roosevelt said, “they seek to hide behind the Flag and the Constitution. In their blindness they forget what the Flag and the Constitution stand for. Now, as always, they stand for democracy, not tyranny; for freedom, not subjection; and against a dictatorship by mob rule and the over-privileged alike.”
- Franklin Roosevelt 1933

Offline chyros

  • a.k.a. Thomas
  • * Esteemed Elder
  • Posts: 3515
  • Location: The Netherlands
  • Hello and welcome.
Re: How I store my keyboards: the banana method
« Reply #14 on: Fri, 10 June 2016, 07:52:04 »
It's pronounced "ba-NAH-na" here. Back home you can collect them for free from big bins at the entrance of supermarkets, but Sainsbury's don't appear to be so generous. Maybe if I ask them.

I presume in Canada they say either "ba-NEH-na" like your Southern neighbours, right? Or maybe "banana-eh"? :P

In the US it is pretty much always "ba-NAN-uh"
Yes, but you pronounce "nan" like "nen" :p .
Check my keyboard video reviews:


Offline fohat.digs

  • * Elevated Elder
  • Posts: 6567
  • Location: 35°55'N, 83°53'W
  • weird funny old guy
Re: How I store my keyboards: the banana method
« Reply #15 on: Fri, 10 June 2016, 08:04:41 »

Yes, but you pronounce "nan" like "nen"


Tricky business, those vowels.

I spent a year reading the "Lord of the Rings" to my kids, about one chapter per night at bedtime, and I pronounced the 2 "a" letters in "Gandalf" the same.

When we went to see the movies, they used the harder "a" sound for the first syllable and the softer one for the 2nd.

The "banana" version that I am referring to is the way the actors pronounced the 1st "a" in Gandalf.
“These economic royalists complain that we seek to overthrow the institutions of America. What they really complain of is that we seek to take away their power."
He paused for a moment, then thundered, “Our allegiance to American institutions requires the overthrow of this kind of power!”
“In vain,” Roosevelt said, “they seek to hide behind the Flag and the Constitution. In their blindness they forget what the Flag and the Constitution stand for. Now, as always, they stand for democracy, not tyranny; for freedom, not subjection; and against a dictatorship by mob rule and the over-privileged alike.”
- Franklin Roosevelt 1933

Offline chyros

  • a.k.a. Thomas
  • * Esteemed Elder
  • Posts: 3515
  • Location: The Netherlands
  • Hello and welcome.
Re: How I store my keyboards: the banana method
« Reply #16 on: Fri, 10 June 2016, 13:10:43 »

Yes, but you pronounce "nan" like "nen"


Tricky business, those vowels.

I spent a year reading the "Lord of the Rings" to my kids, about one chapter per night at bedtime, and I pronounced the 2 "a" letters in "Gandalf" the same.

When we went to see the movies, they used the harder "a" sound for the first syllable and the softer one for the 2nd.

The "banana" version that I am referring to is the way the actors pronounced the 1st "a" in Gandalf.
I'm probably thinking too Southern - I imagined it sounding more like ba-NAYUH-na :)) .
Check my keyboard video reviews:


Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
Re: How I store my keyboards: the banana method
« Reply #17 on: Tue, 14 June 2016, 03:54:43 »
Here in Canada we say bah-NAN-ah, as most people do. The "eh?" is optional, and equates to how people in the UK add "what?" ("Lovely day, what?") and jazz musicians "you dig?".

Chyros, I'm sorry to hear you have such trouble picking up these lovely cajas de fruta. Today Safeway were glad to give me several more, which my wife wanted for our upcoming move. She tells me her friends are catching on to the sheer storage power of these double-walled beauties, once they're correctly reinforced (the boxes, that is, not my wife's friends, who hardly need reinforcement). The fact that they're just the right size for KBs (a tremendously useful abbreviation, BTW, that I'm disappointed my otherwise highly efficient GHers have failed to embrace) is only a bonus.

Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
Re: How I store my keyboards: the banana method
« Reply #18 on: Sun, 10 July 2016, 21:24:48 »
A follow up on my Banana Method posts:

Depending on the brand of boxes you use, some may seem too narrow to accommodate wider keyboards (such as Model M-101s). This usually isn't because the boxes are too small, but because they've been smushed inward a bit from being stacked so high during shipment.





If this happens, you can take the bottom half of the box and return it to its original size by gently pushing out its left and right sides—first in the middle, then closer to each corner.

I'm so helpful.

Offline Aran.E99

  • Posts: 181
  • Location: United kingdom
Re: How I store my keyboards: the banana method
« Reply #19 on: Thu, 14 July 2016, 16:34:14 »
i might actually try this...

on the bright side, if someone breaks into your house for the specific purpose of stealing vintage mechanical keyboards, they will see a box of bananas and be like 'eww, bananas' and leave empty handed!

-Aran
SMK 2nd Gen Blue Alps mount <3

Offline ander

  • * Esteemed Elder
  • Thread Starter
  • Posts: 1197
  • Location: Vancouver, BC
  • I type, therefore I am
Re: How I store my keyboards: the banana method
« Reply #20 on: Sun, 24 July 2016, 05:10:36 »
i might actually try this... if someone breaks into your house for the specific purpose of stealing vintage mechanical keyboards, they will see a box of bananas and be like 'eww, bananas' and leave empty handed!

This, too, is a distinct advantage of a fruit-oriented approach to KB storage. It may also end up affecting your wardrobe:




Offline Screwdriver

  • Posts: 63
Re: How I store my keyboards: the banana method
« Reply #21 on: Mon, 25 July 2016, 18:49:33 »
Nice..!
Realforce 87U/55g, Deck Hassium Pro-MX Browns, MK Disco TKL - KBT Browns, Code 87-MX Clears, KUL-87 MX Reds.

Offline hwood34

  • underwater squad
  • * Exalted Elder
  • Posts: 5909
  • Location: USA
  • #1 CL stan
    • Keyboard Illuminati
Re: How I store my keyboards: the banana method
« Reply #22 on: Tue, 26 July 2016, 00:27:10 »
i might actually try this... if someone breaks into your house for the specific purpose of stealing vintage mechanical keyboards, they will see a box of bananas and be like 'eww, bananas' and leave empty handed!

This, too, is a distinct advantage of a fruit-oriented approach to KB storage. It may also end up affecting your wardrobe:


Show Image


so we finally get to see a picture of the elusive ander
IV KWK Info Thread & KBK Info Thread IV (out of date)

Old GBs: Gateron Switches (2015) | CF-LX R1 (2015) | CF-LX R2 (2017) | CF-LXXX (2017) | Gen.s Gem Caps (2015)

"Under no pretext should arms and ammunition be surrendered; any attempt to disarm the workers must be frustrated, by force if necessary"

Offline SBJ

  • Posts: 1166
  • Location: Denmark / The city.
  • Tactile pls
Re: How I store my keyboards: the banana method
« Reply #23 on: Tue, 26 July 2016, 05:20:13 »
i might actually try this...

on the bright side, if someone breaks into your house for the specific purpose of stealing vintage mechanical keyboards, they will see a box of bananas and be like 'eww, bananas' and leave empty handed!

-Aran
They will have to take them from my cold dead hands! :D

Offline spiritanimals

  • Posts: 20
  • Location: FL, USA
Re: How I store my keyboards: the banana method
« Reply #24 on: Tue, 26 July 2016, 07:52:25 »
Nice write up! I'm definitely going to incorporate this at work, where I have keyboards stacked on shelves all willy-nilly.
    

Offline Aran.E99

  • Posts: 181
  • Location: United kingdom
Re: How I store my keyboards: the banana method
« Reply #25 on: Tue, 26 July 2016, 10:19:37 »
wait - what if you have to buy a box full of bananas... guess i will have to put my keyboards in my banana box and my bananas in my keyboard box...
SMK 2nd Gen Blue Alps mount <3