Changelog:7/14 - Updated IC Posted (old IC link:
https://geekhack.org/index.php?topic=112347.0).
7/14 - Zoomed in Kit Renders for better visibility.
7/15 - Revamped Base kitting entirely (Support for Full size, 1800, TKL, 75%, 65%, and 60%, Alice layout and ISO support included)
7/16 - Google Form updated.
7/16 - Updated Base Renders as the originals were blurry, new renders higher resolution.
7/16 - Updated Summit Base Render to reduce noise, contrast between cap and legend is far improved now.
7/20 - Added to Vendor List possibility for KR region.
7/26 - Added Norde kitting.
7/28 - Vendor List Announced!
7/28 - Small change made to IC.
7/28 - Updated Google Form.
7/31 - Updated Vendor list with new US Vendor, Dangkeebs!
8/9 - Added F13 and Mod Colored Tilde to both Summit and Base Camp.
8/11 - Created and added link to Discord Server!
8/18 - US vendor swap. From Dangkeebs to Kono.
8/22 - Added Row - identification to kit renders and <1u keycap sizes are now labeled.
9/2 - Improved Gear Set (Novelties) Render.
9/3 - Added Flag Set Kit.
9/3 - Overhauled colors for Flag Set Kit and removed Norde kit.
9/3 - Added Poll Google Form at the top of IC. Please respond as results are very important for choices to be made for my set.
9/3 - Small IC Improvements made for quality of life.
9/5 - Added new image to bottom of IC.
9/9 - Added renders of Base Camp on Rotor by Densus.
9/12 - Removed Summit Base Kit and instead is an Alternative Kit.
9/12 - Added description to gear set and adjusted descriptions for Summit Alternative and Base Camp.
9/12 - Added F13 key to Summit Alternative Kit.
9/14 - Big changes made to IC, new custom IC post labels have been added. Some images also have been swapped.
9/14 - Added IG handle.
10/7 - Adjusted some alignment/sizing of Nightfall desk mat.
10/7 - Added Summit Alternative Kit on Rotor by densus renders. Please go to Summit Alternative Kit Renders - more.
1/18 - Revamped IC.
2/9 - New render added.
2/10 - New render added.
2/11 - New render added.
2/18 - DCS conversion. Complete. Novelties soon.
2/19 - Relegendables, Kingsize (10u Spacebar) kits added.
2/21 - Deskpad added
2/21 - Optimized Summit Alternative Alphas and Base Camp kits to include Terminal ISO.
2/24 - I'm pleased to announce that US vendor Thockeys will be hosting DCS Mountaineering!
3/8 - Updated Keybee x DCS Mountaineering renders.
3/11 - New & updated deskmats added to IC. Prototypes soon (ETA 2-3 weeks)
3/23 - GB date announced, pricing and much more.. is to be revealed soon. Geekhack GB thread soon.
3/29 - First collaboration pieces of the ''ICED OUT'' collection revealed. More soon.
4/4 - J-01 x DCS Mountaineering LE Bundle revealed. Pricing (US), extra collaborations and more has been revealed.