In the Round 1,  The failure of PCB MOQs resulted in Manual soldering,  I waited and tried to gather more orders till mid January.
and The Inspection and Reproductions for some parts took a long long time.   I am so sad.     Apology!!!  
 
 I will try my best to ship out the remaining R1 orders, as soon as possible!!!  
 
  In the Round 2,  I will try to gather enough for the MOQs, if Not,  I will drop it or try to fill it.   This may boost the whole speed. 
The Process of Inspecting and Sorting Parts and Springs are much improved during R1, I guess it will be much faster (max. 1 months) 
The Small parts are already organized to be ready for Round 2. 
Thanks Guys for this Happen!   It was my dream to have things like this.  
