This was my "office" today. At the platform on top. The blue manlift is a ZX-135. The ZX is the style of boom, and the 135 is max height to the floor of the platform.. Maxed out, the lift got to within 5 feet of the floor of the platform on the top of the bucket elevator we are tearing down.
Sending the platform along with 20 feet of trunking for the bucket elevator at one shot. This chunk weighed 8300 pounds. The crane was good for 34,000 pounds where he was making the pick. Done safely in 8 hours. That is why I choose to work union.